New Home Building Inspections Melbourne
Independent checks at every stage, so you know it's done right.
Even brand-new homes can have issues that slip through.
A stage-by-stage inspection means problems are found while they're still easy to fix, not after you've moved in.
-
Same-Day Reports
Your stage report delivered the same day as your inspection.
-
Nearly 20 Years Experience
Built homes from the ground up. That trade knowledge comes to every inspection.
-
Family Run and Independent
We work for you and only you.
Qualified carpenter and licensed timber pest inspector
Professional Indemnity and Public Liability insured
Inspections completed to Australian Standards AS 4349.1
Should You Get a Building Inspection on a New Home?
Most people assume a new home is safe from defects. It is not always the case.
Builders are managing multiple projects and tight schedules. Work gets signed off quickly. By the time you reach handover, issues that could have been caught early are now built in, behind plasterboard, under concrete, under cladding.
A stage inspection puts an independent, qualified eye on the work at each key point during construction. Problems are identified while they are still accessible and straightforward to fix. You have the evidence in writing and the leverage to get it resolved before the next stage begins.
Whether you are building with a volume builder or a custom builder, an independent inspection is one of the most practical things you can do to protect your investment.
It is far easier to fix a problem during a build than after handover. Stage inspections exist for exactly that reason.
Our 5-Stage New Build Inspections
Book individual stages or the full five. We work around your build timeline.
-
Stage 1 - Base Stage
Before the slab is poured, we check the excavation, formwork, and reinforcement to make sure the foundation is set up correctly. Problems at this stage are critical, they affect everything built above.
-
Stage 2 - Frame Stage
We assess the structural frame to confirm it aligns with the approved plans and meets building code. This covers wall framing, roof trusses, bracing, and tie-down connections.
-
Stage 3 - Lock-up Stage
External cladding, roof covering, windows, and doors are inspected. We check that the building envelope is weathertight and that the work meets standards before internal fit-out begins.
-
Stage 4 - Fixing Stage
Internal fixtures and finishes are inspected - plasterboard, wet area waterproofing, cabinetry, and joinery. Waterproofing in particular must be checked before tiling covers it. This is one of the most critical stages for identifying defects.
-
Stage 5 - Handover Inspection (PCI)
A full Practical Completion Inspection before you take the keys. We check every accessible area of the completed home for defects, incomplete work, and anything that falls short of what was specified. You get a written report to take into your handover meeting.
Why Choose ProView for New Home Inspections?
Dean has spent nearly two decades in residential construction, building new homes from the ground up. He knows the process from the inside. He knows which stages carry the most risk, what good work looks like at each one, and what to look for when it's not right.
Sarah manages every client relationship from first enquiry through to final report. Between the two of them, you are looked after at every stage of your build.
-
A background in new residential construction
Dean has built new homes from the ground up. He brings that firsthand knowledge to every stage inspection.
-
Same-Day Stage Reports
Your report is delivered the same day as the inspection. You get the findings while they are still relevant.
-
Reports that are easy to understand
We tell you what we found, what it means, and what needs to happen next.
-
Honest, independent advice
We are not connected to your builder. We work only for you.
Common Questions About New Home Building Inspections
-
Yes. Even with a good builder, issues can slip through, particularly in fast-moving builds. A stage inspection catches problems while they are still accessible and easy to fix. Once work is covered over, defects become much more expensive to address.
-
We inspect the work completed at each stage against Australian Standards and the approved plans. Each stage focuses on different elements, from the foundation and frame through to internal fixtures and the final handover check. You receive a written report with photos the same day.
-
You can book individual stages or the full five, whatever suits your build and budget. Many clients start with the frame and fixing stages, as these carry the most risk. Others book the full five for complete peace of mind.
-
PCI stands for Practical Completion Inspection. It is the final inspection before you take the keys, a thorough check of the completed home for defects, incomplete work, and anything that falls short of what was agreed. We recommend it for every new build.
-
Yes. We coordinate directly with your builder or site supervisor to arrange access at the right time in the construction sequence. We follow all site protocols.
-
Pricing depends on the number of stages you need. Get in touch for a tailored quote, we will give you an upfront price.
-
Your report is delivered the same day as the inspection, including photos and a clear summary of findings.
-
Yes. You are welcome to attend. Many clients find it helpful to walk through the findings with us on the day.
Book Your New Home Building Inspection
Whether you need one stage or all five, we work in with your timeline and get your report to you the same day.